| BELLANTRA BRIDGE REPLACEMENT Co. Leitrim. |
Works involved the removal of an existing steel and timber bridge deck which spans the river Shannon at Lough Allen sluices with reinforced concrete deck. The works required a road closure which was designed, co-ordinated and implemented by L&M Keating Ltd. A bridge parapet was provided to the edges of the new structure with safety barriers to the approaches. A combination of temporary works such as suspended scaffolding and purpose built work access platforms were used to construct elements of the work. The new deck consisted of reinforced concrete beam with a reinforced concrete topping. A spray applied waterproofing system was provided with an asphalt surface. The existing concrete abutments were repaired and modified to receive the new RC deck. |
| Client | ESB Power Generation 27 Lower Fitzwilliam St. Dublin 2 |
| Value | €100,000 |
| Date of Completion | 2010 |