Main menu:
Projects > Industrial Projects
| ESB Moneypoint Environmental Retrofit Project, Kilrush, Co. Clare |
Moneypoint Generating Station at Kilrush, Co. Clare is the largest power station in Ireland having 3 generating sets each capable of producing 300MW. Imported coal is used and the installation includes extensive facilities for handling bulk coal and ash. From 2005–2008 the station underwent a major Environmental Retrofit to install scrublers to the existing plant; and simultaneously replace and upgrade numerous elements of the old plant. L&M Keating Ltd. were heavily involved in this project, carrying out numerous building and civil engineering elements of the work. A feature of this activity was the close coordination involved, working with numerous other contractors of many nationalities on a very concentrated site, while the existing generating station remained in service. Health and Safety issues were paramount, and new standards were set and achieved to ensure this project was completed safely and on programme. Works carried out by L&M Keating Ltd.: UREA Plant Ground slab with wall, constructed as watertight pit, 1x Foundation for reactor building (steel carcass + cladding), 2x Foundations for reactors, 2x Foundations for reactor feed tanks, 2x Foundation for urea dissolver tanks, 4 x Foundation for pumps (foundation), 1x Control & Instrumentation Building, Drain pit and drain gutters, 2x external pumps foundations Batching Plant 1x C & I Building, 1x Foundation for Industrial water tank, 2 x FGD product storage silos, 1x Foundation batching plant with separate foundation for solid mixers, 2x Burnt lime silos, 2 x Foundation for hydration (blow down) water tanks, Foundation for conveyors and towers Roadworks Extension of existing road with pathways, paving around new installation Drainage Works Flue Gas De-sulpharisation, Selective Catholitic Reduction Auxiliary power Supply – Transformers (3 units) Foundation for transformers including Oil pits, Foundation for sprinkler, Cable Trenches to existing, Trenches (Transformer Area), Fire blast walls, Brickwork walls, Fencing with Gates, Drainage Control Room Replacement Phased reconstruction of Main Station Control Room By Product Disposal Construction of Byproduct disposal area – lined earthwork bund. Commencing and operation of byproduct landfill area Temporary Site Accommodation Provision and servicing of approximately 10,000 sq ft of temporary site accommodation and associated services for varied contractors. |
| Clients | ESB, ESB International Lurgi (Lentjes) AMEC |
| Architects/Engineers | Benaims, ESBI |
| Value | €8.0m |
| Programme | Ongoing |
| Date of Completion | Ongoing |