Dredging | L & M Keating

Grand Canal Basin Slipway, Stop Logs & Underwater Concrete Repairs

Design and installation of 40x11m slipway on driven piles including design and installation of 30x15x5m deep water retaining sheet piled cofferdam. Design and construction of 12x6m stop log system complete with tilting weir. 2000m2 of underwater microfibre reinforced concrete wall installation. 2000m3 of dredging from spud barge.

Keywords

dredging, cofferdam, structural, steel, sheet, piling, slip, underwater, concrete, microfibre, retaining, diving, port, harbour

Project:

Grand Canal Basin Slipway, Stop Logs & Underwater Concrete Repairs

Status:

Completed

Client:

Waterways Ireland

Services Provided:

Dredging, Civil, Marine Engineering