Main menu:
Projects > Design Build
| PORTUMNA BRIDGE REPLACEMENT, Portumna, Co. Galway. |
This project involves the replacement of the vehicular crossing of the navigation span of the River Shannon provided by the existing Portumna opening swing bridge, with a new opening swing bridge which is to be located in the same location as the existing bridge. The new bridge incorporates a new piled foundation as well as mechanical and electrical components to rotate the bridge. The replacing of the bridge is to be complete during a 10 day possession of the bridge, the bridge is to remain operational at all times during construction. A new plant room and control room are to be constructed, as well as associated services. |
| Client | Waterways Ireland. 2 Sligo Road, Enniskillen, Co. Fermanagh |
| Engineer | Royal Haskoning, 10 Bernard Street, Leith, Edinburgh, EH6 6PP. |
| Value | €2.2m |
| Programme | 6 months |
| Date of Completion | December, 2008. |
Portumna Bridge Refurbishment.
Click here for details.